Any time your facility purchases X-ray equipment, there are some big, important steps that need to be taken before it gets installed. Some of these are necessary to get you compliant with regulations in your area, some are needed to ensure patient and tech safety, and others simply save you time, hassle, and money by making sure your X-ray room is ready to receive your new equipment as soon as it arrives.
Below, we'll help you learn what to expect from the X-ray compliance process, as well as from the room preparation process, namely which responsibilities are commonly held by an X-ray provider and which are likely to fall to you and your team.
Before you begin building your X-ray room, check with the section of your state’s health department responsible for X-ray radiation compliance. They’ll help you determine if you need to submit a preliminary drawing of your X-ray room prior to beginning construction. Some X-ray providers, Block Imaging among them, can provide you with drawings.
Depending on the type of X-ray equipment you intend to install you may need to undergo a “shielding plan review”. The review process varies from state to state, but the following items are commonly asked about:
The reviewers will also want a drawing of the rest of the building that shows adjacent areas/rooms. This is to ensure that the equipment won’t be installed right next to areas where care is administered to radiation-susceptible patients.
Some states do not require lead-lined walls for some mobile fluoroscopy equipment, like C-arms, but most have required standards for fixed X-ray equipment. Make sure that your building is built to code to include lead-lined walls as dictated. The thickness of the lead varies by state and machine type, so be careful to mind the particulars of your local standards. Your physicist can also put together a lead shielding plan for your contractor.
We can't stress this enough: The most important and helpful thing you can do to help your X-ray equipment project is to communicate often. In most cases, the company providing your X-ray system is not directly involved in physically preparing your room to receive your new equipment, but offers information and assistance along the way.
We can't speak for every X-ray provider in the marketplace, but for those (like Block Imaging) with assigned project management personnel, the advance stages of installation typically include planning consultation, inspection, and detailed drawings from the provider, with the actual construction/modification of your building worked out between you and your contractors. As an example, the diagram below shows Block Imaging's process for X-ray room preparation and installation, with responsibilities delineated.
As you move from task to task in the preparation stage, be sure to maintain periodic communication with your provider. If they are kept up to date on your project's progress, the finishing stages become more likely to wrap up without incident or delay.
Between your own team, your construction contractors, your X-ray provider, and your local compliance agencies, there are many moving parts to a (seemingly) simple X-ray room installation. The more legwork you can do before the parts start moving, the better your chances of having your project go smoothly and on schedule.
If you have more questions about X-ray equipment, installation, parts, or service, our team is ready to help. Use the button below to tell us how we can be of assistance.
Imaging equipment service is not a one-size-fits-all proposition, and comes with many questions.
Interventional cath and angio systems are not only big investments, they're a cornerstone modality in hospitals and clinics. This is why it's crucial...
If you've owned or operated an MRI machine for even just a few years of the last decade, you know that the cost per liter of liquid helium continues...